PROJECT TYPE

Private Commercial

SERVICES PROVIDED

  • Drainage installation
  • Nine-stall parking lot installation
  • Six-inch graded aggregate base
  • Two-inch 19MM Superpave course
  • One-and-a-half-inch 9.5MM Superpave surface
  • Sidewalk installation

PROJECT DURATION

CONTRACTED BY

B2R Services

PROJECT OVERVIEW

Askew & Sons completed drainage, parking-lot, paving, and sidewalk work for the 15th Street Townhome Development. The documented scope included drainage installation; construction of a nine-stall parking lot over a six-inch graded aggregate base; a two-inch 19MM Superpave course; a one-and-a-half-inch 9.5MM Superpave surface course; and sidewalk installation.

PROJECT SCOPE

  • Drainage installation
  • Nine-stall parking lot
  • Graded aggregate base
  • 19MM and 9.5MM Superpave courses
  • Sidewalk installation

Project Photos

Featured Projects

Roswell Resurfacing

Roswell, Georgia
Askew & Sons completed the Roswell resurfacing project.

Holly Springs Chipotle

Holly Springs, Georgia
Askew & Sons completed grading, aggregate base installation, asphalt paving, signage, and striping for the Holly Springs Chipotle project for Caliber 1 Construction.

Highlands Church Kids Expansion

433 Canton Road, Building 400, Cumming, GA 30040
Askew & Sons performed full-scope civil sitework for the Highlands Church Kids Development at 433 Canton Road, Building 400, Cumming, Georgia.