B2R Services
Askew & Sons completed drainage, parking-lot, paving, and sidewalk work for the 15th Street Townhome Development. The documented scope included drainage installation; construction of a nine-stall parking lot over a six-inch graded aggregate base; a two-inch 19MM Superpave course; a one-and-a-half-inch 9.5MM Superpave surface course; and sidewalk installation.