PROJECT TYPE

SERVICES PROVIDED

  • Grading
  • 6-inch Graded Aggregate Base
  • 2-inch 19MM Asphalt
  • 1.5-inch 9.5MM Asphalt
  • Signage Installation
  • Striping

PROJECT DURATION

November 2025–May 2026

CONTRACTED BY

PROJECT OVERVIEW

Askew & Sons completed grading, aggregate base installation, asphalt paving, signage, and striping for the Holly Springs Chipotle project for Caliber 1 Construction. The documented contract duration was November 2025 through May 2026.

PROJECT SCOPE

  • Graded the site and installed a 6-inch graded aggregate base course
  • Placed 2 inches of 19MM asphalt
  • Placed a 1.5-inch 9.5MM asphalt surface
  • Installed signage and striping

Project Photos

Featured Projects

Roswell Resurfacing

Roswell, Georgia
State Route 42, known locally as North Henry Boulevard, serves as a crucial transportation artery in the southern suburbs of Metro Atlanta, particu...

Holly Springs Chipotle

Holly Springs, Georgia
State Route 42, known locally as North Henry Boulevard, serves as a crucial transportation artery in the southern suburbs of Metro Atlanta, particu...

Highlands Church Kids Expansion

433 Canton Road, Building 400, Cumming, GA 30040
State Route 42, known locally as North Henry Boulevard, serves as a crucial transportation artery in the southern suburbs of Metro Atlanta, particu...

READY TO DISCUSS YOUR NEXT PROJECT?

Whether you’re planning roadway improvements, asphalt paving, site development, or infrastructure upgrades, Askew & Sons is ready to help.