PROJECT TYPE

SERVICES PROVIDED

  • Grading
  • 6-inch Graded Aggregate Base
  • 2-inch 19MM Asphalt
  • 1.5-inch 9.5MM Asphalt
  • Signage Installation
  • Striping

PROJECT DURATION

November 2025–May 2026

CONTRACTED BY

PROJECT OVERVIEW

Askew & Sons completed grading, aggregate base installation, asphalt paving, signage, and striping for the Holly Springs Chipotle project for Caliber 1 Construction. The documented contract duration was November 2025 through May 2026.

PROJECT SCOPE

  • Graded the site and installed a 6-inch graded aggregate base course
  • Placed 2 inches of 19MM asphalt
  • Placed a 1.5-inch 9.5MM asphalt surface
  • Installed signage and striping

Project Photos

Featured Projects

Roswell Resurfacing

Roswell, Georgia
Askew & Sons completed the Roswell resurfacing project.

Holly Springs Chipotle

Holly Springs, Georgia
Askew & Sons completed grading, aggregate base installation, asphalt paving, signage, and striping for the Holly Springs Chipotle project for Caliber 1 Construction.

Highlands Church Kids Expansion

433 Canton Road, Building 400, Cumming, GA 30040
Askew & Sons performed full-scope civil sitework for the Highlands Church Kids Development at 433 Canton Road, Building 400, Cumming, Georgia.